Details
- Construction Date 26 Feb 2020
- Category Air Conditioning
Description
We were contacted by one of our clients to design and install a comfort cooling/ heating system for their function room.
Our chief engineer attended site and carried out a full site survey of the office. The size of the room and hight of ceilings. The outdoor units had tobe located in the car park and were within the permitted refrigerant piping range. All services had to be positioned inside white plastic trunking as there were no false ceilings.
The client specified that he wanted us to install Daikin four way blow under ceiling split system heat pump air conditioning units which is one of the industries leaders in the air conditioning market.
We installed 4 number Daikin fourway blow under ceiling split system heat pump air conditioning.
All work was carried out over 3 days to minimise disruption of use in the function room.