Details
- Construction Date 21 May 2020
- Category Air Conditioning
Description
We were contacted by one of our clients to design and install two comfort cooling/ heating system for bedroom and dining room .
Our chief engineer attended site and carried out a full site survey of the designated areas. Staff are provided adequate personal protective equipment to keep them safe and to mitigate the risk of transmission from client to staff vice versa.
The outdoor units had to be located at the front of the property and were within the permitted refrigerant piping range. All services had to be positioned inside white plastic trunking.
The client specified that the wanted us to install Mitsubishi Electric Multi Split air conditioning system .We installed 2 number Mitsubishi Electric Multi Split systems .
All work was carried out over 1 days to minimise disruption.